Architect-designed homes, built to the standard the drawings set.
New builds and major rebuilds where the architecture is expressed through proportion, line, junction and finish, and the build either honours those decisions or breaks them.
Architectural homes succeed when the construction discipline matches the design discipline.
Proportion holds when set-out is accurate. Line holds when alignment is controlled across openings, reveals, ceiling lines and trim junctions. Detail holds when shadow gaps, expressed joints, margins and reveals are executed consistently, not interpreted differently by each trade.
None of this happens by accident on site. It is a function of pre-construction documentation, datum-led set-out, and a site team that understands what is being protected.
Rosedale in Glen Iris, with its steel-fin facade, is an architect-designed home where holding the line the design set was the whole task. TCON has delivered architectural homes for Webster Architecture and Interiors, Pleysier Perkins, MRTN Architects and Archier.
The most risk-laden phases of an architectural home are not the framing or the cladding. They are the transitions.
The eight transitions that carry an architectural home:
- Waterproofing interfaces - Flashings - Penetrations - Thresholds - Glazing packages - Joinery integration - Stone templates - Finish protection
TCON resolves these in advance through buildability review, procurement planning and timing. Construction is then sequenced so each transition has the conditions it needs to be executed cleanly.
When a junction needs a specific result, TCON works to mock-ups, samples and critical-element approvals. The objective is the completed home, not the completed building. Mock-ups are not a process formality. They are the only way to confirm before installation that a detail will read the way the architect intended.
The build runs through the TCON Pre-Construction Program first. Buildability findings, procurement schedules and program implications are resolved before construction begins. On site, the work is run through named site leadership with documented hold points and inspection routines. Architect site visits run on a rhythm agreed at the start of construction, so the design team sees the build at the points where their input matters most.
Building with TCON
Considered architecture demands considered building. Building with TCON is a complete account of how TCON works. Available on request and reviewed personally by Tim before release.
Request a copy of Building with TCON.
Related. Capability, Denman Home, Merton, Architects we work with.